This project deployed a
400kW generator set as an emergency power supply system to ensure stable power supply to the school in the border region, addressing the characteristics of frequent rainfall and power grid fluctuations in the area. Equipped with an intelligent parallel control system, it can automatically start within 10 seconds of a mains power outage, ensuring uninterrupted power supply to teaching buildings, laboratories, and dormitories. Since its commissioning, the project has operated stably and provided reliable power, receiving unanimous praise from the client.